TMX6-10 Rittisbergbahn
lt;p>Timed to coincide with the ski resort’s 50th anniversary, the completion of the TMX6-10 Rittisbergbahn brought significant modernization to the Schladming-Dachstein region, with much greater flexibility and performance. The journey time to the top station at 1500 meters has been almost halved compared to the previous lift and now takes just over three minutes. Thanks to its 3-in-1 technology, the system can be operated as a gondola lift, a chairlift, or a combination of the two.This makes the Telemix ropeway on Rittisberg is the ideal solution, because the mountain is popular with families and used in many different ways. These include, increasingly, cross-country skiing, winter hiking, and snowshoeing. By combining cabins and chairs, the new ropeway offers the flexibility needed for the ascent. Another of its benefits is that it makes it easier to carry sledges for the illuminated night toboggan run on Rittisberg. Only the cabins are used in summer. This Telemix ropeway positions the resort ideally for the opening of a new mountaincart route scheduled for summer 2023. Special holders have been developed for the carts so that they can be transported outside the cabin. </p>
LEITNER on LinkedIn: Since this winter, skiers in the SkiArena
LEITNER in Austria
skiresort magazine for managers and operators
TMX6-10 Rittisbergbahn
January 2024 – Lift Blog
LEITNER in Austria
LEITNER Vipiteno
LEITNER on LinkedIn: #leitnerropeways #wemove #innovationsince1888
Rittisbergbahn
Leitner-Poma – Lift Blog